Case study

A municipality increased its lagoon capacity and postponed a $600,000 dredging project

Case study

BioSpikes® 5000 was used as an alternative to physically dredging the lagoon and thus postponing a $600,000 dredging project, by effectively reducing the sludge levels and liberating lagoon treatment capacity. 

Get immediate access to the case study by filling out your details.

Or learn more about the biological alternative

Contact